- 1、本文档共18页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
GMP认检查评定标准
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- BIOS中文对照表及BIOS详解.doc
- BIM详软件介绍及总结.docx
- bjy防荧光灯和防爆全塑荧光灯价格.docx
- avay综合布线解决方案.doc
- BIM改建筑业.doc
- AVR开环境的入门.doc
- BOLL标的原理和计算方法.doc
- byy防标志灯和防爆金属卤化物灯价格.docx
- CAD与秀快捷命令集合.doc
- cad中那些快捷键.doc
- 江苏省南京市江浦高级中学2024届高考全国统考预测密卷语文试卷含解析.doc
- 河北唐山市第一中学2024届高三3月份第一次模拟考试语文试卷含解析.doc
- 汕头印象城市介绍旅游旅行宣传推广课件.pptx
- 江西省抚州市临川区二中2023届高三(最后冲刺)英语试卷含解析.doc
- 新疆维吾尔自治区和田地区2023-2024学年高三适应性调研考试语文试题含解析.doc
- 江西南昌城市介绍宣传推广课件.pptx
- 河南省平顶山市部分学校2024届英语五下期末质量跟踪监视试题含解析.doc
- 新疆生产建设兵团农八师一四三团一中2023年高三第五次模拟考试语文试卷含解析.doc
- 母婴护理知识月嫂培训课件.pptx
- 必威体育精装版整理地铁工程安全生产监理实施细则优选 .pdf
文档评论(0)