- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
GRE复详细时间表
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- bjy防荧光灯和防爆全塑荧光灯价格.docx
- avay综合布线解决方案.doc
- BIM改建筑业.doc
- AVR开环境的入门.doc
- BOLL标的原理和计算方法.doc
- byy防标志灯和防爆金属卤化物灯价格.docx
- CAD与秀快捷命令集合.doc
- cad中那些快捷键.doc
- CAD命快捷键及高级技巧.doc
- BSP电客票操作手册.doc
- 汽车4S店员工内训课件07奥迪4S店新员工培训.pdf
- 辽宁省第二届职业技能大赛(轨道车辆技术赛项)理论参考试题库(含答案).pdf
- 2024年第四届全国工业设计职业技能大赛决赛(包装设计师)理论考试题库(含答案).pdf
- 精品解析:2022年广西壮族自治区学业水平考试押题预测卷 (一)历史试题(原卷版).docx
- 2024版《立体构成》全套课件完整版.ppt
- 《机上应急医疗》习题及答案.docx
- 2024年儿童保健技能大赛理论考试题库500题(含答案).pdf
- 计算机整机装配调试员技能竞赛备考试题库(含答案).pdf
- 《机床电气控制与PLC》期末试卷-A卷及答案.doc
- C++程序设计教程课件-C++多态与虚函数课件.pdf
文档评论(0)