- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
led防马路灯和防爆灯价格
润联网
登录【润联网】查询价格
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts ma
您可能关注的文档
- ERP沙模拟大赛攻略秘笈Word 文档.docx
- DTⅡ型定式带式输送机的设计.doc
- DECH分布式能源及微网技术及应用案例研究.docx
- ERP沙模拟大赛攻略秘笈教你玩转ERP.doc
- ERP系使用作业指导书.doc
- ERP系物料编码原则.docx
- ESAM密认证模块.doc
- Exce在水库水文资料整编中的应用.doc
- E时代移之家.doc
- ERP操手册委外业务操作手册.doc
- 温州乐成寄宿中学2023年高三第二次模拟考试语文试卷含解析.doc
- 湖南省浏阳市第二中学2022-2023学年高三第一次调研测试语文试卷含解析.doc
- 甘肃省张掖市高台县重点名校2024年中考一模英语试题含答案.doc
- 甘肃省会宁县第四中学2024届高三下学期第六次检测语文试卷含解析.doc
- 滁州市重点中学2024届高三第四次模拟考试语文试卷含解析.doc
- 福建省福州市仓山区福建师范大学附属中学2023届高考冲刺模拟英语试题含解析.doc
- 福建省平和县一中2022-2023学年高考压轴卷语文试卷含解析.doc
- 湖南省长沙市一中、湖南师大附中2023年高三英语第一学期期末学业质量监测模拟试题含解析.doc
- 监狱警察职业道德培训课件.pptx
- 福建省漳州市平和一中、南靖一中等五校2023年高三第六次模拟考试语文试卷含解析.doc
文档评论(0)