- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 6
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking insta
您可能关注的文档
- “八个严”“个不准”.doc
- “云南白牙膏”品牌传播策略研究.doc
- “万豪家建材超市”首期营销策划方案.doc
- “中国长之乡”麻阳探秘.doc
- “中秋联会”主持稿.doc
- “十二五期间重点发展的文化产业聚集区.doc
- “口袋书辅导.doc
- “发烧友小米手机营销设计策划书.doc
- “千尊”迁学院营销策划.doc
- “十二五国家科技支撑计划.doc
- 2024学年第一学期浙江省精诚联盟10月联考高二物理试题含答案及解析.pdf
- 【山东卷】山东省泰安市2024-2025学年高三上学期11月期中考试(11.13-11.15)英语试卷含答案及解析.pdf
- 【浙江卷】浙江省杭州市四校联考2024-2025学年高一上学期10月月考英语试卷含答案及解析.pdf
- 西南大学附中高一10月月考生物试卷含答案及解析.pdf
- 辽宁省县域重点高中协作体2024~2025学年高一上学期10月质量监测试题历史试卷含答案及解析.pdf
- 基于多功能超疏水材料的海水淡化及油水分离研究.pdf
- FKBP5基因多态性与抚养方式对孤儿静息态脑功能的影响.pdf
- 《因明入正理论略抄及后疏》的研习与创作感受.pdf
- HIF-1α、SGK1在子宫内膜增生及子宫内膜癌孕激素抵抗中的表达和意义.pdf
- 初中信息科技大单元教学设计框架构建及应用研究--以《人工智能》大单元为例.pdf
文档评论(0)