- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 4
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts markin
您可能关注的文档
- 《变电站合自动化》 总结.docx
- 《吃出健来》.doc
- 《商品学论》答案.doc
- 《国有建用地使用权出让合同》示范文本详解.doc
- 《国际社的主要成员:主权国家和国际组织》 导学案.doc
- 《国际结》案例集锦.doc
- 《变电站合自动化概述》教案.doc
- 《团队凝力训练营》.doc
- 《学术论写作》教学大纲.doc
- 《外汇交理论与实务》.doc
- 2022中学教师培优辅差个人工作计划.pdf
- 2020年苏州科技大学统计学(同等学力加试)考研复试冲刺狂背五套题.pdf
- 321 第一类WORD文件之字元及符号设定.pdf
- 2021上半年北京市丰台区事业单位《职业能力倾向测验》试题及答案.pdf
- 20212022学年新教材高中英语UNIT3CONSERVATION单元综合检测含解析北师大版选择.pdf
- 2021届福建省福州市高三下学期毕业班3月质量检测(一模)化学试卷及答案.pdf
- 2021届广西桂林崇左贺州高三下学期4月联合模拟考试理科综合化学试卷及答案.pdf
- 2020财务报告分析案例.pdf
- 2021年高考理科综合实战押题卷生物试题(全国卷)(附答案).pdf
- 2020年辽宁省抚顺市望花区中考物理三模试卷.pdf
文档评论(0)