- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
【学习沙】“石头”老师教你最in网货定价技巧总结
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 《操作系》小论文.doc
- 《房地产估》.doc
- 《数据库用系统设计》复习资料王恺.doc
- 《无形资》随堂练习答案.doc
- 《服装材学》教学大纲.doc
- 《景容短:技能教育杂谈》征订函.doc
- 《桑拿浴所》标准送审稿.doc
- 《机床数技术》实验指导书.doc
- 《旅游地学》教学大纲.doc
- 《桥涵水》教案.doc
- 北京市二手车买卖合同5篇 .pdf
- 军队文职人员招聘考试《新闻学》真题精选 .pdf
- 历届茅盾奖作品名单.docx
- 湖北省部分高中联考协作体2024-2025学年高一上学期11月期中考试 化学 PDF版含解析.pdf
- 湖北省武汉市部分学校2024-2025学年高一上学期期中英语试题 含答案.docx
- 江苏省扬州中学2024-2025学年高一上学期11月期中考试 生物 含答案.docx
- 湖北省部分高中联考协作体2024-2025学年高一上学期11月期中考试 生物 PDF版含答案.pdf
- 湖北省新高考联考协作体2024-2025学年高二上学期11月期中联考物理试题 含解析.docx
- 湖北省“荆、荆、襄、宜四地七校考试联盟”2024-2025学年高二上学期期中联考数学试卷 含答案.docx
- 浙江省丽水市五校高中发展共同体2024-2025学年高一上学期11月期中联考物理试题 含答案.docx
文档评论(0)