- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
一下普适作业 李雅
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 《理财学理》教学大纲.doc
- 《电子商案例》复习提纲.doc
- 《思想道修养与科学文化修养》教学设计赵士莉.doc
- 《消费者为学》期末复习资料.doc
- 《电路》学大纲.doc
- 《病理学》第次作业.docx
- 《社交礼》综合复习.doc
- 《社会调研究》期末复习重点.doc
- 《着力改民生的重点政策解读》上答案.doc
- 《现代概陶瓷艺术在景德镇》.doc
- 2024-2030年中国卧式铣床行业运行状况及投资前景分析报告.docx
- 2024-2030年中国卫生圆形人孔盖行业市场发展趋势与前景展望战略分析报告.docx
- 2024-2030年中国卫生巾行业消费形势与竞争格局分析研究报告.docx
- 2024-2030年中国卫生材料及医药用品行业应用趋势及投资盈利预测报告.docx
- 2024-2030年中国即时通信行业市场现状供需分析及投资评估规划分析研究报告.docx
- 2024-2030年中国即时热水器行业市场发展趋势与前景展望战略研究报告.docx
- 2024-2030年中国卷绕机行业经营模式及投资前景研究建议报告版.docx
- 2024-2030年中国压水堆(PWR)行业市场发展趋势与前景展望战略分析报告.docx
- 2024-2030年中国压力伤害预防行业市场发展趋势与前景展望战略分析报告.docx
- 2024-2030年中国压力机市场供需现状与前景策略分析研究报告.docx
文档评论(0)