- 1、本文档共36页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
一尺街服理念学习材料
山东一尺街餐饮
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking
您可能关注的文档
- 《纳税基与实务》期末复习小抄精装版.doc
- 《社会调研究与方法》期末复习.doc
- 《纳税基与实务》任务.doc
- 《纳税基与实务》任务二答案.doc
- 《纳税实》桉例.doc
- 《纺织材学》教学大纲.doc
- 《组织行学》作业.doc
- 《统计学理》教学大纲.doc
- 《维护消权》教案设计罗春燕.doc
- 《纳税申与筹划》实习指导书.doc
- 2024年安徽创新发展研究院(决策杂志社)招聘8人笔试备考题库及答案解析.docx
- 2024江西南昌市疾病预防控制中心(市卫生健康综合监督执法局)招聘劳务派遣制人员3人笔试备考题库及答案解析.docx
- 2024年度北大荒农垦集团有限公司所属事业单位“黑龙江人才周”公开招聘工作人员20人笔试备考题库及答案解析.docx
- 2024昆明市盘龙区新迎第三幼儿园第二分园编外人员招聘(32人)笔试备考试题及答案解析.docx
- 2024年宜昌宜都市第二批大学生乡村医生专项招聘1人笔试模拟试题及答案解析.docx
- 2024辽宁锦州市太和区卫健系统面向社会招聘事业单位人员补充笔试备考试题及答案解析.docx
- 2024辽宁沈阳市事业单位招聘退役大学毕业生士兵411人笔试备考试题及答案解析.docx
- 2024江西省江铜铜箔科技股份有限公司招聘20人笔试备考试题及答案解析.docx
- 2024年11月广西梧州市苍梧县城镇公益性岗位人员招聘1人笔试备考试题及答案解析.docx
- 2024年安庆市第一人民医院康复科招聘3人笔试备考试题及答案解析.docx
文档评论(0)