- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
丁督导医检验技术人才培养方案长江大学
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 《网络资与信息检索》研究与实践型学习指导书.doc
- 《老王》读教学中的互联网有哪些信誉好的足球投注网站教案.doc
- 《舌尖上宿舍·泡面》出炉“秘籍”大公开.docx
- 《计算机用基础》知识宝典.doc
- 《逍遥游教案.doc
- 《都江堰教学设计.doc
- 《计算机络》教学大纲.doc
- 《酒店预系统》数据库设计说明书.doc
- 《错账更方法》教学设计.doc
- 《零岁教的秘诀》精华摘记.doc
- 标准操作说明书手册规程ThermofisherAQF-2100H-Aquion-RFIC.pdf
- Q-Writer_使用说明书手册_v5.6_TC.pdf
- Q-Touch_使用说明书手册_v1.7_SC.pdf
- 标准操作说明书手册规程Waters-H-class-SQD2.pdf
- 标准操作说明书手册规程ThermoFisher-Nicolet-iS50.pdf
- A-Plus HPC07SA 加热型磁力搅拌器使用说明书.pdf
- NYASM_使用说明书手册_v5.2_SC.pdf
- 餐饮业明厨亮灶技术规范 第1部分:通则.pdf
- 餐饮业明厨亮灶技术规范 第5部分:设施设备.pdf
- 餐饮业有害生物风险管理指南.pdf
文档评论(0)