- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 《马克思义哲学原理》在线作业.doc
- 『商业地营销策划大全』.doc
- 「认识保」优良保险教案选拔活动.doc
- 【复习精】商品包装概论已排版.docx
- 【学习沙】“石头”老师教你最in网货定价技巧总结.doc
- 【合肥木装箱】设计方案.doc
- 【强烈推】出国留学的十个建议.doc
- 《计算机础知识》doc版电子书.doc
- 【李强】传统走向现代.doc
- 【时事政】.doc
- 2025年斜巷运输安全管理规定范本(2篇) .pdf
- 2025年新乡市事业单位重塑性改革方案 .pdf
- 2025年高速公路扩能工程建设项目策划工地标准化建设管理办法_图文 .pdf
- F202525【复试】2025年延边大学202504技术经济及管理《加试人力资源管理.pdf
- F202508【复试】2025年国防科技大学2025网络空间安全《复试F2025计算机完整版.pdf
- 2025进出口办理流程 .pdf
- 2025年后勤服务保障中心采购管理办法 .pdf
- 2025年危货运输企业安全生产管理制度汇编 .pdf
- 2025年安全生产责任制和安全生产奖惩制度(2篇) .pdf
- 2025年出勤率与绩效挂钩制度 .pdf
文档评论(0)