- 1、本文档共26页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
三极管基知识及测量方法
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 【电子书备】细节决定成败读后感.doc
- 【电大】通概论自行整理版【按字母顺序排序】.doc
- 【毕业论】酒店人才流失的原因与对策分析.doc
- 【预防医】论文儿童铅中毒现状及防治措施.docx
- 【酒店式寓商务公寓SOHO小户型公寓专业营销策划方案】.doc
- 【薪酬福】 自助式福利设计四步走.doc
- 【店铺陈】纽约市Valentino华伦天奴旗舰店设计.docx
- 【饮食男】深夜食堂,舌尖记忆.doc
- 【超市案宝典】.doc
- 【营销狂商品流通产业周期性波动特徵分析.doc
- 【西北卷】【陕西卷】陕西省2025年高考适应性检测(一)(陕西一模)(11.9-11.10)语文试卷答案.docx
- 【江苏卷】江苏省徐州市2024-2025学年2025届高三第一(上)学期11月期中抽测(11.7-11.8)英语试卷.docx
- 一年级下册美术课件-13《彩泥连连看》-湘美版-(共13张PPT).ppt
- 整体混凝土装配式建筑施工培训讲义.ppt
- 文献综述及论文写作学习心得.docx
- 世界近代史名词解释、简答.doc
- 十万个为什么科普小知识大全100字.doc
- 【西北卷】【陕西卷】陕西省2025年高考适应性检测(一)(陕西一模)(11.9-11.10)语文试卷.docx
- 【湖南卷】湖南省金太阳2025届高三一轮复习期中联考(25-158C)(11.8-11.9)生物试卷.docx
- 【江苏卷】江苏省徐州市2024-2025学年2025届高三第一(上)学期11月期中抽测(11.7-11.8)生物试卷.docx
文档评论(0)