- 1、本文档共22页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
下一代通网络技术
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 22
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 七氟丙烷体灭火系统.doc
- 三下采煤术现状.doc
- 三个低碳市国际性经典案例.doc
- 七眼桥镇标责任书.doc
- 三亚海坡目全程策划系统.doc
- 三体系内检查表.doc
- 三农经典品简介.doc
- 三叉神经诊治指南.doc
- 三好学生迹材料.doc
- 三大主流技术.doc
- DB14∕T 1469-2017 胡麻垄膜集雨沟播栽培技术规程.docx
- DB14∕T 1395-2017 北柴胡种植技术规程.docx
- DB14∕T 1494-2017 柴胡主要病虫害绿色防控技术规程.docx
- DB14∕T 1603-2018 荞麦配方施肥技术规程.docx
- DB14∕T 1420-2017 核桃水肥一体化滴灌技术规程.docx
- DB14∕T 1346-2017 灌溉果园白三叶种植与利用技术规程.docx
- DB14∕T 1568-2018 日光温室生菜高效固碳生产技术规程.docx
- DB14∕T 1350-2017 红枣苗木繁育技术规程.docx
- DB14∕T 1518-2017 晋汾白猪种质分子鉴定 SSR 标记法.docx
- DB14∕T 1362-2017 奶牛围产期精准化饲养管理技术规程.docx
文档评论(0)