- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
专利代理代码标准
文章来源:/Content-1021.htm免费咨询法律问题/tiwen.htm 律师在线解答 云法律网拥有万名专业律师3-5分钟快速解决您的法律问题
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one,
您可能关注的文档
- 三线五阶学模式探索.doc
- 三星手机销策略解析.doc
- 三维打印型技术必威体育精装版研究进展.doc
- 三峡大学士学位点简介.doc
- 三八妇女活动文案插花活动.doc
- 上下水管装方案.doc
- 三相四线能计量装置安装.doc
- 上半任务填写模板.doc
- 上市房企融资进入“倒计时”.doc
- 上海交大算机第一次作业.docx
- 2025届湖北省新高考协作体高三语文上学期期中试卷附答案解析.pdf
- 2025届吕梁市高三语文上学期期中考试卷附答案解析.pdf
- 2024-2025学年兰州市高一数学上学期期中考试卷附答案解析.docx
- 2023学年福州市马尾区九年级语文(上)期期末试卷附答案解析.pdf
- 2025届西安市高三数学上学期期中联考试卷附答案解析.docx
- 2025届青岛市58中高三数学上学期期中考试卷附答案解析.docx
- 2025届北京市海淀区高三数学上学期期中练习试卷及答案解析.pdf
- 2024年秋学期盐城市陈洋中学高二数学期中考试卷附答案解析.pdf
- 2025届陕西省高三语文上学期模拟检测考试卷(一)附答案解析.pdf
- 2024-2025学年台州市十校高一数学上学期期中联考试卷及答案解析.pdf
文档评论(0)