- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
业主联谊发言稿
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 上海市国土地使用权出让合同.doc
- 上海市新村生活污水处理现状分析及对策.doc
- 上东郡营策划论文.doc
- 上海市房产项目全过程审批环节告知汇总.doc
- 上海城市游景点.doc
- 上海市污排放标准.doc
- 上海开放大公关与社交礼仪答案.doc
- 上海期货易所.doc
- 上海期货易所上市品种介绍.doc
- 上海检验医生信息.doc
- 人教版九年级英语全一册单元速记•巧练Unit13【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit9【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit11【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit14【单元测试·提升卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit8【速记清单】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit4【单元测试·提升卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit13【单元测试·基础卷】(原卷版+解析).docx
- 人教版九年级英语全一册单元速记•巧练Unit7【速记清单】(原卷版+解析).docx
- 苏教版五年级上册数学分层作业设计 2.2 三角形的面积(附答案).docx
- 人教版九年级英语全一册单元速记•巧练Unit12【单元测试·基础卷】(原卷版+解析).docx
文档评论(0)