- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 上篇 片机设计基础.doc
- 上证ET期权的交易策略与风险.docx
- 上消化道血作业答案继续医学教育.doc
- 上海片区发及借鉴.docx
- 下一代网业务技术研究.doc
- 上海期货易所铜注册品牌汇总.doc
- 下一代网与IP多媒体通信.doc
- 上饶灵山景区旅游开发.doc
- 下面的是AD的快捷键.doc
- 下一代通网络技术.doc
- 2022年山西省朔州市公开招聘警务辅助人员辅警笔试专项训练题试卷2含答案.docx
- 841抛物线(题型战法)-2023年高三数学一轮复习题型与战法精准训练(新高考专用)(原卷版).docx
- 第六单元共同面对的全球性问题(背诵清单)-2023-2024学年八年级历史与社会下学期单元速记巧练(人文地理下册).docx
- 2021年四川省阿坝自治州公开招聘警务辅助人员辅警笔试专项训练题试卷3含答案.docx
- 2021年江西省吉安市公开招聘警务辅助人员辅警笔试必刷经典测试卷1含答案.docx
- 2022年贵州省六盘水市公开招聘警务辅助人员辅警笔试专项训练题试卷1含答案.docx
- 防汛抗旱工作总结范文(6篇).pdf
- 第03讲一元一次不等式(8类题型).docx
- 新课程改革背景下小学语文教材单元整体教学策略研究.docx
- 新课程标准下小学语文单元整体教学设计的实践与研究.doc
文档评论(0)