- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
个人网站划书
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 世界地理必修三复习提纲答案版.doc
- 专访华坤威创始人孟宪坤:站上思维巨塔,看清未来.docx
- 世界海运心向亚太转移 中国成为海运强国尚面临诸多挑战.doc
- 世界所有车标志及其产生的意义.doc
- 世界汽车牌大全.doc
- 世界文化产荟萃重点知识纲要之二.doc
- 世界天然物药发展现状.doc
- 世界绿化木产业现状分析中国花木商城.doc
- 世界著名车标志及图片.doc
- 世界顶级山鞋介绍和选购.doc
- 第18讲 第17课 西晋的短暂统一和北方各族的内迁.docx
- 第15讲 第14课 沟通中外文明的“丝绸之路”.docx
- 第13课时 中东 欧洲西部.doc
- 第17讲 第16 课三国鼎立.docx
- 第17讲 第16课 三国鼎立 带解析.docx
- 2024_2025年新教材高中历史课时检测9近代西方的法律与教化含解析新人教版选择性必修1.doc
- 2024_2025学年高二数学下学期期末备考试卷文含解析.docx
- 山西版2024高考政治一轮复习第二单元生产劳动与经营第5课时企业与劳动者教案.docx
- 第16讲 第15课 两汉的科技和文化 带解析.docx
- 第13课 宋元时期的科技与中外交通.docx
文档评论(0)