- 1、本文档共14页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国公民康素养读本
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 东风风神销策划分析.doc
- 东财《公社交礼仪》在线作业一.doc
- 丧葬服务未来经营模式探讨.doc
- 东南大学电实验第八次实验有源滤波器.doc
- 两种绩效数计算方法的比.docx
- 个人委托档人员参加基本医疗保险须知.doc
- 两种液体合设计.doc
- 两岸咖啡牌特色与竞争优势doc.doc
- 个人履历的填写.doc
- 个人所得税务筹划.doc
- 河北省秦皇岛市海港区2022-2023学年七年级上学期开学考试数学试题(含答 .pdf
- 湖北省2021-2022学年七年级上学期数学期中试卷A卷 .pdf
- 河南省信阳市潢川县第四中学2022-2023学年九年级上学期第一次月考化学.pdf
- 液压机械设备生产建设项目可行性研究报告 .pdf
- 浙江省台州市书生中学2022-2023学年中考数学考试模拟冲刺卷含解析.pdf
- 河北省唐山市迁安市2022-2023学年数学七年级第一学期期末综合测试模拟试 .pdf
- 沪科粤教版物理八年级下册探究杠杆平衡条件 学案 .pdf
- 湖北省各地市2023-中考数学真题分类汇编-02填空题(基础题)知识点分类.pdf
- 海上无线电监测浮标的覆盖范围研究 .pdf
- 消防设施操作员保养速记-概述说明以及解释 .pdf
文档评论(0)