- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国养老障的基本模式评价与改革研究
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 丧葬服务未来经营模式探讨.doc
- 东南大学电实验第八次实验有源滤波器.doc
- 两种绩效数计算方法的比.docx
- 个人委托档人员参加基本医疗保险须知.doc
- 两种液体合设计.doc
- 两岸咖啡牌特色与竞争优势doc.doc
- 个人履历的填写.doc
- 个人所得税务筹划.doc
- 个人廉政险排查防范表.docx
- 个人理财业答案.doc
- 《课时2 电解质在水溶液中的反应》基础巩固.docx
- 高一数学期末模拟卷03(全解全析)(新高考地区专用).docx
- 《认识化学科学》素养练.docx
- 高一数学期末模拟卷02(全解全析).docx
- 【区域地理专项练习】《北方地区》(原卷版).doc
- 高考物理一轮总复习精品课件 第5章 机械能 第2讲 动能定理及其应用 (2).ppt
- 人教版高中英语选择性必修第三册精品课件 Unit 4 ADVERSITY AND COURAGE Section Ⅰ Reading and Thinking (2).ppt
- 高一数学期末模拟卷02(考试版A4)【测试范围:必修第一册】.docx
- 宣传活动布置方案范文.docx
- 《第四单元 基因的表达》章末检测.docx
文档评论(0)