- 1、本文档共10页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
- 东南大学电实验第八次实验有源滤波器.doc
- 两种绩效数计算方法的比.docx
- 个人委托档人员参加基本医疗保险须知.doc
- 两种液体合设计.doc
- 两岸咖啡牌特色与竞争优势doc.doc
- 个人履历的填写.doc
- 个人所得税务筹划.doc
- 个人廉政险排查防范表.docx
- 个人理财业答案.doc
- 个人所得手续费返还.doc
- 关于动物的说明文.doc
- 关于动物初中作文素材模板.doc
- 关于动物的初一600字作文.doc
- 关于端午节的作文400字五篇2020.doc
- 关于端午节的一篇作文400字心得5篇.doc
- 关于动物的初一语文作文.doc
- 2024_2025学年高中历史第7单元苏联的社会主义建设第21课二战后苏联的经济改革教师用书新人教版必修2.doc
- 2024_2025学年高中化学专题三有机化合物的获得与应用第三单元人工合成有机化合物课时作业含解析苏教版必修2.doc
- 2024_2025学年高中数学第一章立体几何初步1.2.1平面的基本性质与推论学案新人教B版必修2.doc
- 2024_2025学年新教材高中生物第5章细胞的能量供应和利用第1节降低化学反应活化能的酶第2课时酶的特性学案新人教版必修1.doc
文档评论(0)