- 1、本文档共59页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中国公民康素养条
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking install
您可能关注的文档
最近下载
- 第二单元 项目1 《 获取长城研学路线-互联网信息有哪些信誉好的足球投注网站》教学设计 2024—2025学年安徽版(2024)初中信息技术七年级上册.docx VIP
- 江苏省2024普通高中学业水平合格性考试英语真题卷 .pdf
- 第二单元+项目1+《+获取长城研学路线-互联网信息有哪些信誉好的足球投注网站》课件+2024—2025学年安徽版(2024)初中信息技术七年级上册+.pptx VIP
- 浙江交投高速公路建设管理有限公司部分中层管理岗位公开竞聘【综合基础知识500题】高频考点模拟试题及参考答案解析.docx
- 天然气对井内压力的影响(五)课件.pptx VIP
- 妇产科医疗质控总结.pptx VIP
- 企业内部控制指引.doc
- 山东大学齐鲁医院诊断证明.docx VIP
- 心胸外科出科.pptx VIP
- 2024贵州遵义市面向优秀村(社区)干部专项招聘乡镇(街道)事业单位工作人员61人笔试备考题库及答案解析.docx VIP
文档评论(0)