- 1、本文档共21页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation lo
您可能关注的文档
- 中国铁路输现状分析.doc
- 中国鞋类展总结.doc
- 中国项目价状况调查问卷.doc
- 中国食品城漯河杯.doc
- 中国饮食化区域性特征.doc
- 中国高校学专业大全分类汇总.doc
- 中国高端美行业调查:整体美丽方案受青睐.docx
- 中外全文据库的比较.doc
- 中国黄土原水土流失的治理.doc
- 中国零售防损的发展趋势.doc
- 2023-2024学年广东省深圳市龙岗区高二(上)期末物理试卷(含答案).pdf
- 2023-2024学年贵州省贵阳市普通中学高一(下)期末物理试卷(含答案).pdf
- 21.《大自然的声音》课件(共45张PPT).pptx
- 2023年江西省吉安市吉安县小升初数学试卷(含答案).pdf
- 2024-2025学年广东省清远市九校联考高一(上)期中物理试卷(含答案).pdf
- 广东省珠海市六校联考2024-2025学年高二上学期11月期中考试语文试题.pdf
- 2024-2025学年语文六年级上册第4单元-单元素养测试(含答案).pdf
- 2024-2025学年重庆八中高三(上)月考物理试卷(10月份)(含答案).pdf
- 安徽省安庆市潜山市北片学校联考2024-2025学年七年级上学期期中生物学试题(含答案).pdf
- 贵州省部分校2024-2025学年九年级上学期期中联考数学试题(含答案).pdf
文档评论(0)