- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
交强险与业三责险的比较
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation loc
您可能关注的文档
- 丽水电大学专业毕业论文操作指南.doc
- 举办残奥意义.doc
- 主要污染排放系数.doc
- 主流手机商品牌竞争力解析.doc
- 主持人开白台词精选,超级全哦.doc
- 久咳嗽不的药方.doc
- 丽江市地系统纳税服务平台暨财税库银横向联网操作流程指南.doc
- 义乌市稠街道办事处防震减灾预案.doc
- 乌兰察布青川农牧业猪场.doc
- 乌鲁木齐交线路.doc
- 护理学相关知识复习测试卷共三套.doc
- 护理学相关知识复习试题含答案(3套).doc
- 2025届高考语文复习:补写句子 课件.pptx
- 气压带和风带对气候的影响(第1课时)(教学设计).docx
- 气压带和风带对气候影响教学设计2024-2025学年高中地理人教版(2019)选择性必修1.docx
- 《故都的秋》课件 2024-2025学年统编版高中语文必修上册.pptx
- 《屈原列传》课件 2024-2025学年统编版高中语文选择性必修中册.pptx
- 《巫溪家乡文化》课件-2024-2025学年高一语文同步备课课件(统编版必修上册).pptx
- 《苏武传》课件 2023-2024学年统编版高中语文选择性必修中册.pptx
- 郑州中控ZKTime8.3 WEB考勤软件培训文档.pptx
文档评论(0)