- 1、本文档共56页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
仿古建筑理实施细则
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installa
您可能关注的文档
- 交互电子板多媒体教室方案推荐.doc
- 产业发展城市化.doc
- 交通对乡旅游发展的影响及对策.doc
- 产业园行定位与分析.doc
- 产业布局整与内需结构变迁.doc
- 产业结构升级和优化.doc
- 产业创新展模式:几种典型实践及影响选择的因素.doc
- 产业结构业论文初稿 副本.doc
- 产业结构评价方法.doc
- 产业转移资源跨区域调配.doc
- Flexiv 工业机器人系列编程:R70_FlexivR70编程语言基础.docx
- Flexiv 工业机器人系列编程:R20_13.多机器人协作与调度.docx
- Fetch Robotics 协作机器人系列编程: Freight1000_故障排除与维护.docx
- Flexiv 工业机器人系列编程:R70_FlexivR70工业机器人的通信协议.docx
- Flexiv 工业机器人系列编程:R20_4.编程语言与工具.docx
- Flexiv 工业机器人系列编程:R20_6.感知技术与环境交互.docx
- Flexiv 工业机器人系列编程:R20_9.故障诊断与维护保养.docx
- Flexiv 工业机器人系列编程:R20_17.用户自定义功能开发.docx
- Fetch Robotics 工业机器人系列编程: Freight AGV_FreightAGV的编程环境搭建.docx
- Fetch Robotics 工业机器人系列编程: Freight Max_案例研究与实践项目.docx
文档评论(0)