- 1、本文档共32页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
保险业开论文
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 4
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking insta
您可能关注的文档
- 优 秀 队 辅 导 员 事 迹.doc
- 任务八营与策划.doc
- 众邮基于RM的邮件营销方案.doc
- 优替UTPPT服装策划人赵月话说品牌定位.docx
- 优生优育掌握的七大保健方法.doc
- 优秀个人历模版大全.doc
- 优秀实习个人总结.doc
- 优秀师德习心得体会+师德演讲稿篇.doc
- 优秀大学简历样本.doc
- 优秀个人历模板.doc
- 2025届新教材高考物理一轮复习第四章曲线运动万有引力与航天实验5探究平抛运动的特点学案新人教版.docx
- 2025届高考生物一轮复习综合检测含解析新人教版必修1.doc
- 2025届高考英语一轮复习课时作业三十一选修⑩Units3~4课时作业含解析牛津译林版.docx
- 2024_2025学年高中政治第一单元生活智慧与时代精神1.1生活处处有哲学作业含解析新人教版必修4.doc
- 2024_2025学年新教材高中物理习题课5抛体运动的规律含解析新人教版必修2.doc
- 2024_2025学年高中政治第四单元认识社会与价值选择12.3价值的创造与实现作业含解析新人教版必修4.doc
- 江苏专用2025版高考生物一轮复习第1单元细胞的概述及其分子组成第2讲细胞中的元素及无机化合物学案.doc
- 2025版高考地理一轮复习课时作业二十七自然环境和人类活动的区域差异含解析鲁教版.doc
- 2025届高考数学一轮复习单元双优测评卷__第四章数列B卷含解析.docx
- 2025届高考生物一轮复习课后检测案33种群的特征和数量变化含解析新人教版.docx
文档评论(0)