- 1、本文档共18页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公文处理公文写作
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts marking installation location and rotation about the direction you want. 7.3.14. hangers installation 7.3.14.1 hanger layout a. a clear design of hanger should be installed strictly in accordance with the drawings and designs shall not be installed wrong, missing, etc. B. own arrangement of piping support and hanger set and selection should be based on comprehensive analysis of general layout of piping systems; cold installation of steam pipe with particular attention reserved for compensation of thermal expansion displacement and orientation. C. support systems should be rational to withstand pipe loads, static load and incidental load; reasonable piping displacement; guaranteed under various conditions, stress are within the allowed range. Strength, stiffness, and meet requirements to prevent vibration and soothing water, without affecting the adjacent equipment maintenance and other piping installation and expansion. D. equipment connected to the interface to meet pipeline thrust (torque) limit requirements; increase the stability of piping systems to prevent pipeline ... C. welding elbow should be not less than 1.5 times the pipe diameter. D. Press elbow should be not smaller than the outside diameter of the pipe.PAGE 16
carried out; 4) for spring hangers (included simple spring, hangers and constant support hangers) it should also be recognized as setting and locking of loads. 5) check the surface quality, folded layering and without cracks, rust and other defects. 5) after completion of the test and control drawing number one by one, by series baled. Color alloy steel parts, the parts mark
您可能关注的文档
- 入党转正请书及思想汇报.doc
- 全南县分落实千名干部下基层.doc
- 入学教育话稿.doc
- 全国优秀目经理申报表.doc
- 全国十大点城市软件和信息技术服务业快速发展.doc
- 全光网的展及其挑战.doc
- 全国各地食特产介绍.doc
- 全国各地产一览包括港澳台.doc
- 全国各省市毕业生回生源地派遣单位一览表.doc
- 全国土地类过渡.doc
- 《中国通史》文字稿第12集春秋争霸.docx
- java教程--类与对象-讲义课件(演讲稿).ppt
- Vue应用程序开发-(1).pptx
- 东北师大版社劳动实践与评价指导手册一年级上册主题二活动一寻找五彩的树叶课时课件.pptx
- 外研版英语四年级上册 Module 4 Unit 2 How much is it单元教学设计.docx
- 外研版英语四年级上册Module 4 单元整体教学设计.docx
- 6《上课之前》课件 鄂科技版 心理健康教育一年级.pptx
- 《1~5的认识》说课课件(共25张PPT)人教版一年级上册数学.pptx
- 六《解决问题(1)》说课课件 人教版 三年级上册数学.pptx
- 七《解决问题》说课课件 人教版 二年级上册数学.pptx
文档评论(0)