湖光路13号消防系统设备集成及改造项目施工组织计 工程资料
福建闽安投资工程有限公司
第 PAGE 42 页 共 NUMPAGES 42 页
湖光路13号消防系统设备集成及改造项目工程
施工组织设计
目录
一、消防工程概况·····························································································3
1.1 工程概况············································································································3
1.2 工程内容············································································································3
1.3 工程重点难点··································································································3
二、编制依据········································································································6
三、施工部署········································································································7
3.1 施工组织总体部署·························································································7
3.2 工程管理机构职责划分···············································································7
3.2.1 管理机构图·······································································································7
3.2.2 项目管理班子配备情况表·············································································8
3.2.3 主要管理及技术人员职责说明·····································································9
四、工程计划进度安排与控制·································································10
4.1 工程进度控制·······························································································10
4.1.1 工程进度计划··································································································10
4.1.2 项目进度复核··································································································10
4.1.3 月工程报告······································································································10
4.2 劳动力投入计划表······················································································11
五、工程施工管理措施··················································································12
5.1 质
您可能关注的文档
- 广东某高速公路总监办监理计划 工程资料.doc
- 广东某热电厂 1×600mw=上大压小=燃煤发电工程勘察设计招标 工程资料.doc
- 广东省地矿局探矿机械厂综合楼工程施工组织方案 施工组织.doc
- 广东建院实训大楼施工组织 施工组织.doc
- 广东省某小区第12栋楼单位工程施工组织方案 施工组织.doc
- 广东珠江三角洲环境项目(i期)大沙地污水处理系统厂外管网工程黄埔东路区域国内竞争性招标(ncb)招标文件技术规范 工程资料.doc
- 广东珠江三角洲环境项目(i期)大沙地污水处理系统厂外管网工程黄埔东路区域国内竞争性招标(ncb)招标文件商务工程量单 工程资料.doc
- 广元澳源体育中心体育馆工程监理实施细则 工程资料.doc
- 广州xx冷冻仓储物流中心工程监理规划 工程资料.doc
- 广东省惠州剑潭水利枢纽工程施工组织方案 施工组织.doc
文档评论(0)