- 1、本文档共11页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
g业务定价方法和策略
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviati
您可能关注的文档
- doc质量管理制度.doc
- b级挤塑板薄抹灰体系涂料饰面施工方案.doc
- daj企业战略管理与中小企业管理.doc
- ebbdaceafbbdc房地产企业档案管理制度.doc
- cpa考试公司战略与风险管理分析战略分析.doc
- egdrjqo物流管理师认证模拟试题.doc
- epms基于电力行业的erp解决方案.doc
- b系列员工绩效考核管理制度.doc
- dlink中小酒店网络解决方案.doc
- erp项目实施与维护项目设计方案.doc
- 二零二五版商业秘密保护与员工竞业禁止协议范本.docx
- 二零二五版必威体育官网网址协议书模板,10款精选版助力企业必威体育官网网址.docx
- 二零二五版商业机密必威体育官网网址协议——《新兴产业》.docx
- 二零二五版商业机密必威体育官网网址合同范本.docx
- 二零二五版家政服务与雇主及第三方监管机构三方合作合同.docx
- 二零二五版城乡规划与宗教事务规划服务合同.docx
- 二零二五版城乡土地整治规划与实施服务合同.docx
- 二零二五版对外合作必威体育官网网址协议范本修订-@-1.docx
- 二零二五版备货合同范本(12页全面规定)-@-2.docx
- 二零二五版场监管总局全国合同示范文本库:电子商贸领域应用指南.docx
文档评论(0)