- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全面教你:bios设置usb启动方法图解
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +
您可能关注的文档
- 从成功迈向卓越全球领先企业的渠道管理与大客户开发.doc
- 优秀工商管理本科毕业论文浅析民营企业新时期可持续发展战略.doc
- 会议管理办法参照执行.doc
- 何谓精细化管理(1.doc
- 住宅物业管理法律法规学习普及参考题一单项选择.doc
- 会议营销管理手册.doc
- 企业管理之s现场管理推进.doc
- 余基建项目建设管理制度交底办法.doc
- 供应商、承包商、变更管理制度.doc
- 余世维领导艺术管理技巧系列课程.doc
- c程序员面试题及答案.doc
- 第01讲 运动的描述(练习)(解析版)-【上好课】2025年高考物理一轮复习讲练测(新教材新高考).pdf
- c的面试题及答案.doc
- 第01讲 运动的描述(练习)(原卷版)-【上好课】2025年高考物理一轮复习讲练测(新教材新高考).pdf
- 2003年非典后航空复盘分析报告.pdf
- 第02讲 匀变速直线运动的规律(练习)(解析版)-【上好课】2025年高考物理一轮复习讲练测(新教材新高考).pdf
- 第02讲 匀变速直线运动的规律(练习)(原卷版)-【上好课】2025年高考物理一轮复习讲练测(新教材新高考).pdf
- c考试题库及答案.doc
- c面试题及答案.doc
- 汽车管件及座椅骨架、异形金属结构件生产线改造项目(技术改造)报告表.pdf
文档评论(0)