- 1、本文档共5页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
标准泳池设计方案,一体化泳池水处理方案济南铁路局项目建设说明
济南蓝点环境技术有限公司-游泳池水处理,一站式解决方案提供商
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be lateral raises and numerical deviation of ≤ 0.10MM, qualified before the official lifting. Hoisting of the rotor dynamic and static clearance should be measured, rotors check clearance to prevent rotor colliding. 6.4.4.7 stationary blade carrier, diaphragm and sealing upper cylinder on the inside and install the mounting bolts, bolts and bolt holes in the surface should be coated with molybdenum disulfide. Follow the manufacturers stamp marked to install good sealing ring and spring. Check the sealing ring and spring plate, shall conform to the technical requirements manufacturers drawings. Bolt: ... Measurement with measurement tools, special tools, temporary connection bolts and connection tool equipped and in good condition. The rotor shaft to have fixed, such as thrust, bearing plates fixed installation, in case of wear of the rotor is too large. The coupling gasket check measurements: measured data processing according to gasket, clean the coupling gasket surface clean and Burr-free, check the coupling gasket thickness data, shim thickness deviation of ≤ 0.02mm, parallel degree deviation of ≤ 0.02mm. Coupling temporary bolts ready: preparing 4-8 bolt diameter coupling bolt hole diameter 0.5-1.0mm. 6.4.5.2 shaft coupling 6.4.5.2.1 General requirements in both the relative position of the flange according to the manufacturers mark, if there is no mark, two flange scoop bias complement each other and take care of the bolt hole alignment, hit the mark as basis for alignment and coupling is finally being joined. Each measurement in the two couplings along
position for future reference. Installation using special lifting pole rotor 6.4.4.6 rotor lift, box spirit level to check the rotor axis neck of Yang, on both sides of the rotor should be later
您可能关注的文档
- 材料检验室方案.doc
- 机房综合布线系统设计解决方案.doc
- 来一口食品渠道策略草案版本.docx
- 条正确做事方法.doc
- 某办公楼网络系统方案页.doc
- 果汁类处理方法文档.doc
- 某工程泥浆护壁冲孔灌注桩桩基础工程施工方案.doc
- 杭州德创电子有限公司考勤、休假管理办法版.doc
- 某连锁超市桂林分店开业促销活动整体方案.doc
- 柴油发电机安装及机房环保分包工程管理及技术要求.docx
- DeepSeek培训课件入门宝典:第2册 开发实战篇 .pptx
- 全面认识全过程人民民主-2024春形势与政策课件.pptx
- 2024春形势与政策-全面认识全过程人民民主.pptx
- 2025年春季学期形势与政策第二讲-中国经济行稳致远讲稿.docx
- 2024春形势与政策-铸牢中华民族共同体意识课件.pdf
- 2024春形势与政策-走好新时代科技自立自强之路课件 (2).pptx
- 2024春形势与政策-走好新时代科技自立自强之路课件.pptx
- 形势与政策学习指导教学-整套课件.pdf
- 2023年春季形势与政策讲稿第三讲-开创高质量发展新局面.pdf
- DeepSeek培训课件-清华大学-DeepSeek模型本地部署与应用构建.pptx
文档评论(0)