- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
管理学罗宾斯第版第章知识
管理学 第17章 作为领导者的管理者
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolera
您可能关注的文档
- 策略行销期中考解答学长题库carol.doc
- 管理学课程考试统一知识点学期第一学期共享版.doc
- 第组制造业工程管理与案例.doc
- 管理层培训教案管理理念与角色认知.doc
- 管理定律踢猫效应:企业管理中的警示.doc
- 第章期权定价的数值方法.doc
- 管理心理学整理版.doc
- 管理手册:大中电器(1.doc
- 管理方法与艺术答案总.doc
- 管理流程设计与管理流程再造1.doc
- 中式烹调师理论知识试题库及参考答案(通用版).pptx
- 部编版部编版年级语文上册《zhchshr》课件32.pptx
- 《我上学啦——认识新同学》(说课稿)-2024-2025学年一年级上册数学北师大版.docx
- 中式面点师(初级)考试题库及参考答案.pptx
- 中商职鉴市场营销师培训教师考评试题及参考答案.pptx
- 2023四年级数学上册 四 统计表和条形统计图(一)第3课时 平均数说课稿 苏教版.docx
- Unit 2 My week Part C Story time(说课稿)-2024-2025学年人教PEP版英语五年级上册.docx
- 中考政治必考知识点总结.pptx
- 第18课 生物与非生物(说课稿)-2023-2024学年四年级科学下册同步精品课堂系列(青岛版).docx
- 《耙吸挖泥船舷侧溢流门》.pdf
文档评论(0)