- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
aasld自身免疫性肝炎指南解读
2010年AASLD自身免疫性肝炎指南解读
王绮夏,邱德凯,马雄
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2.
您可能关注的文档
- 食品安全管理体系认证机构依据cnascc的.doc
- 食品安全管理体系审核员注册准则第版.doc
- 食品安全管理手册修改(1.doc
- 食品安全管理手册1.doc
- 食品安全风险评估管理规定与食品质量管理体系认证及食品生产国家强制性技术标准.docx
- 餐饮、火锅店营销方案全文.doc
- 食品质量与安全老食品健康与安全方向专业本科人才培养方案.doc
- 餐饮业成本管理.doc
- 餐饮业haccp制度管理实务义守大学ishouuniversity.doc
- 餐饮营销企划餐饮营销企划计划方案.doc
- 2025年混凝土固化剂行业分析报告及未来五到十年行业发展趋势报告.docx
- 2025年酒店电视行业分析报告及未来五到十年行业发展趋势报告.docx
- 2025-2030年中国DAP微电子封装壳套项目投资可行性研究分析报告.docx
- 2025-2030年中国鸭子行业深度研究分析报告.docx
- 2025年光电芯片行业分析报告及未来五到十年行业发展趋势报告.docx
- 2025年混凝土搅拌设备行业分析报告及未来五到十年行业发展趋势报告.docx
- 2025年金属焊接行业分析报告及未来五到十年行业发展趋势报告.docx
- 2025年光电子线缆行业分析报告及未来五到十年行业发展趋势报告.docx
- 2025年滑雪用具行业分析报告及未来五到十年行业发展趋势报告.docx
- 2025年纳米硫化锌行业分析报告及未来五到十年行业发展趋势报告.docx
最近下载
- 2025年生活会对党委书记领导班子及班子成员的批评意见及建议(写稿参考素材).docx VIP
- 2025年生活会对党委书记领导班子批评意见及建议、“四个带头”方面互提意见、存在问题、一对一谈心谈话记录(写稿参考素材)6份.docx VIP
- Danfoss丹佛斯ECL Comfort 310, A333 operating guide 操作指南.pdf
- 五年级班主任工作计划.docx VIP
- 第一课 立足时代 志存高远(必威体育精装版版).pptx
- 一种农业用生物制剂混合装置.pdf VIP
- 二零二四年度农业用生物制剂配方专利转让合同.docx VIP
- 人教版小学五年级下册英语教学设计.pdf VIP
- 重症肺炎护理查房.pptx VIP
- 《教师的情绪管理》课件.pptx VIP
文档评论(0)