- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《营业税改征增值税政策解读及实务案例分析》考试题答案提交成功,您的得分是分
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +10 mm. 7.3.11 pipe form, location, spacing shall meet the design and specifications. 7.3.12 piping on back or return pipe at higher levels of the upper to automatic valve to install a drain valve below the horizontal parts. 7.3.13 supports and hangers of checks and the number 1) hanger installed must be checked before installation of supports and hangers part models, specifications of springs setting values, whether the materials meet the requirements of drawings and documents; 2) supports and hangers of material, size and accuracy shall conform to the provisions of the design drawings, material technical requirements should be consistent with national standards, industry standards and technical requirements related to the alloy spectrum review should be carried out; 3) pipe supports and hangers part plant product quality certificate for each variable spring supports, constant support hangers, dampers, damper function, there should be factory calibrated test and performance test copies of the record. If necessary, review should be
or equal to 200 mm, not more than 4 mm. 7.3.9 simmering bending production of square steel tube extension, to use the whole tube bending. Interface if necessary, the welding position should be located in the middle of the vertical arm. 7.3.10 install expansion joints should be done. If design is not required, pipe compensator lengthen should conform to the requirements in the following table: square scale length δ x is equal to 1/2. Pre stretch tolerance: casing + 5 mm, +1
您可能关注的文档
- word下载版国考行测真题及解析.doc
- wj二氧化碳培养箱使用说明书.doc
- _动车论坛_牵引供电安全问答带答案.doc
- _造价员考试培训基础理论题目.doc
- _肖星_张家界实现生态旅游的可持续发展对策的浅析_陈竹安.doc
- _动车论坛_edaat综合电力监控模块使用说明书.doc
- ~考研真题英语阅读理解翻译.docx
- ui比较分析样例曾达_基于用户体验的智能手机旅游app界面设计比较分析.docx
- ——刑法解释位阶视域中信用卡涵义的追问的研究.doc
- wcb微机厂用变保护测控装置说明书.doc
- 讲稿:深入理解“五个注重”把握进一步深化改革统筹部署以钉钉子精神抓好落实.pdf
- 副市长在2025年全市医疗工作会议上的讲话.docx
- 2025年市县处级以上党委(党组)理论学习中心组专题学习计划.docx
- 市民族宗教事务局党组书记、局长2024年度民主生活会个人对照检视发言材料.docx
- 烟草局党组书记2024年度抓基层党建工作述职报告.docx
- (汇编)学习2025年全国教育工作会议精神心得体会发言心得感悟.pdf
- 汇编学习领会在二十届中纪委四次全会上的重要讲话精神心得体会.pdf
- 在2025年镇安全生产、消防安全和生态环境保护第一次全体会议上的讲话提纲.docx
- 书记干部座谈会上的讲话+纪委全会上的讲话.pdf
- 党课:从毛泽东诗词中感悟共产党人初心使命.docx
最近下载
- 外研版 选择性必修第二册Unit3 Times change Developing ideas 课件.pptx
- 带头严守政治纪律和政治规矩,维护党的团结统一等四个方面存在的问题与整改材料4.docx VIP
- 市政工程竣工验收流程图汇.doc
- 【新教材】统编版高中历史选择性必修3《文化交流与传播》教学计划(含教学进度表).pdf
- 2024年苏州卫生职业技术学院单招语文考试试题及答案解析.docx
- 美的-风冷热泵模块机组技术手册.pdf
- 2024年长沙职业技术学院单招语文考试试题及答案解析.docx
- 2024年高中生物晨背和晚背知识点.doc
- 医院培训课件:《护理查对制度》.pptx
- 高中数学教学中的学生自主学习能力分析教学研究课题报告.docx
文档评论(0)