SFPD4.08–Rev.July2010.doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
SFPD4.08–Rev.July2010.doc

SFPD 4.08 – Rev. July 2010 PLAN SUBMISSION REQUIREMENTS FOR MODERNIZATION PROJECTS Local Educational Agencies (LEA) requesting modernization funds from the State Allocation Board (SAB) must have the plans reviewed and approved by the California Department of Education (CDE) (Education Code Section 17070.50) prior to submitting a funding request. Preliminary and Final Plan Submission Checklists – The checklists included in this packet identifying the items needed for preliminary plan and final plan submittal must be completed and submitted with the plans. After preliminary plan review, if CDE did not require any changes and the LEA did not revise the plans from the preliminary plan submission, the LEA need not submit a second SFPD 4.08C form or a second set of plans. Indicate in a cover letter that no changes were made to the plans or the educational specifications, and submit an updated SFPD 4.08A, Project Information for Modernization and SFPD 4.08B, Local Educational Agency Certifications for Modernization. CDE Resources and Contact Information - The required forms and instructions necessary for submitting modernization plans to CDE are located in this packet. For more information on the plan review process, visit the SFPD Web page at /ls/fa or call 916-322-2470. California Code of Regulations, Title 5 (Title 5) can be obtained on the Internet at /ls/fa/sf/codes.asp. Submit plans and the required documents to the following address: California Department of Education School Facilities Planning Division 1430 N Street, Suite 1201 Sacramento, CA 95814 SFPD 4.08 Modernization Preliminary Plan Checklist LEA to check boxes indicating the items included in the plan submittal. Submit checklist with plans. CDE may recommend or require changes; therefore, the submission of preliminary plans is required before submission of final plans. It is not necessary to submit construction specifications. Do not include drawings, calculations, or plans for buildings not includ

文档评论(0)

tangtianxu1 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档