网站大量收购闲置独家精品文档,联系QQ:2885784924

名词说明(国外英文资料).doc

  1. 1、本文档共7页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
名词说明(国外英文资料)

名词解释(国外英文资料) Noun explanation: There is a girder: a concrete beam with a brace or a bent bar The creep of concrete, under the effect of load for a long time, the deformation of the concrete will increase with time, namely in the case of constant stress, concrete strain continues to grow over time, this phenomenon is called the creep of concrete Stability coefficient: considering the additional effect of the long thin ratio of the component to reduce the calculation coefficient of the component bearing capacity Double reinforcement section: the rectangular section of the cross section of the affected area and the compression zone is configured Persistent condition: the design condition that must appear in the process of structural use is very long, and its duration is the same as the length of design. Transient condition: the design condition of the construction or the use of the design with the duration of the design is shorter than that of the design. Variable function: the value of the structure is changed over time, and its change value is more than the average Prestressing degree: the ratio of the bending moment M0, which is determined by the prestressing magnitude, to the bending moment Ms produced by the outer load Prestressed concrete: artificially in advance the introduction of the internal stress in the concrete or reinforced concrete, and the value and distribution to offset will be generated using the load stress to an appropriate degree of reinforced concrete Full prestressed concrete: the pull edge cant be pulled at the edge of the pull edge under the combination of short-term effects Partial prestressed concrete: a crack that pulls in tension or does not exceed the width of the specified width of the normal cross section under the combination of short-term effects. Capacity limit: the maximum bearing capacity of the structure or structural component and the deformation or dislocation that is not suitable for carrying on Normal use of the limit state:

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档