网站大量收购闲置独家精品文档,联系QQ:2885784924

家当工程专业卒业论文(国外英文资料).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
家当工程专业卒业论文(国外英文资料)

工业工程专业毕业论文(国外英文资料) Items 2012 session of undergraduate course graduation design (paper) orders, IE analysis of an enterprise and improving the system of Chinese topic: office of the IE analysis of an enterprise and improve the foreign language subject: IEanalysisandimprovementofanenterprise graduation design (thesis) : a total of 37 pages completion date: on May 15, 2012 Reply date: on May 18, 2012, IE analysis and improve the picking an enterprise must be under the background of the eastern coastal economic prosperity, the enterprise has developed rapidly, market competition is increasingly fierce, customer demand is higher and higher, and to the diversification of products, high quality and personalized direction, this for many enterprise puts forward higher requirements on the production and management. Therefore, the enterprise production and operation management it is very urgent for the innovation, the industrial engineering comprehensive improvement is one of the ways to enhance core competitiveness, is the important means to realize enterprise development. Implementation of industrial engineering to improve can improve the companys overall operation management, reduce production cost, improve quality, achieve the goal of enterprise continuously pursue benefit maximization. This paper discusses the self-provided power plant of an enterprise in the process of seeking development due to the problems existing in the enterprise itself become the bottleneck of restricting enterprise development and the reform process. Based on the analysis and summarization of the problems in the past, the solution of the problem is extracted. And on this basis, combining with the actual situation of enterprise itself and the related theories of industrial engineering, from the overall to local industrial engineering are put forward for the comprehensive improvement scheme. Programs involving units of coal-fired power plants, transportation, facilities, and set control center opt

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档