- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
川大《修建工程与装饰工程预算》第一次功课(国外英文资料)
川大《建筑工程与装饰工程预算》第一次作业(国外英文资料)
Special promotion of construction project and decoration project budget for the first time
In the fall of 14, there is a total of test scores: 100 test times:
Single topic selection
Multiple choice
True or false
(10 questions in total, 40 points.)
The water supply and drainage project of an office building is called:
Construction project
Single project
Unit engineering
Partial engineering
Full marks: 4
Buy a batch of steel and add up to 500t. The purchase price of 300t is 3,600 yuan/t, and the original price of 100t is 3,700 yuan/t, and the original price of 100t is 3,800 yuan/t. The overall price of the steel is:
A. 3660 yuan/t
B. 3700 yuan/t
C. 3650 yuan/t
D. 3680 yuan/t
Full marks: 4
When calculating the amount of brick work, the volume of the block is deducted.
A. the wooden brick
B. concrete columns
Reinforce the reinforcement in the masonry
D. insert the head of the beam inside the wall
Full marks: 4
The construction area of the pipeline well in the high-rise building is correct:
A. no matter how many layers, just one level of computation
B. do not calculate the area
No matter how many layers, the area is only the top and bottom
D. according to the natural floor of the building
Full marks: 4
The amount of time produced by an artificial excavation project is 2.5 m3 / day, and its time quota is:
A. 0.4
B. 0.5 workdays/m3
C. 0.25 / m3
Work day/m3
Full marks: 4
If a project has more than doubled the design capacity on the original basis (n = 0.6, f = 1) the investment will increase:
A. 100%
B. 60%
30% C.
D. 50%
Full marks: 4
The wages of the management staff of the building are:
A. labor
B. direct fee
Business management
D. fees
Full marks: 4
The increase in nighttime construction costs:
Direct engineering fees
B. measures fee
C. fees
Business management
Full marks: 4
Project supervision fee shall be included in ().
A. overhead
B. reserve funds
C. engineering other expenses
D. the construction cost of the building
Full marks: 4
The qu
文档评论(0)