网站大量收购闲置独家精品文档,联系QQ:2885784924

手算方法(国外英文资料).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
手算方法(国外英文资料)

手算方法(国外英文资料) A shy; The base three lines L: the center line of the wall, can be calculated outside wall dig geosyncline, exterior wall foundation pad, based masonry walls, exterior wall moistureproof layer, outer wall ring beam, exterior wall body laying subdivisional work, etc. Outside: outer wall outside the outer wall (L + wall + 4). It can calculate the project of flat field, waist line, exterior wall plaster and water dispersability. L: interior wall net long-term, can calculate inner wall dig geosyncline, interior wall foundation pad, interior wall masonry, interior wall moistureproof layer, wall ring beam, interior wall body building, interior wall foundation moistureproof layer, wall plaster and other kinds of construction. S: the construction area, (layered) the calculation items related to the surface: flat surface, ceiling plaster, floor and roof of the building. 2, artificial level ground: S = S base + 2 * L + 16 Third, basic engineering part 1, manual excavation geosyncline increasing column volume (m3), dont put a slope and tired soil retaining plate: V = (B c + 2) * H * L (the picture I cant read you understand) 2, C10 foundation pad (cubic meters) V = L * B * H foundation pad template (m2) S = L * H * 2 sides The C25 has no beam type base (m3), template (square meter). 4, C25 earth beams: V = (in L + L), the form of the section of the inner column (square metre) of the section of the section (square meter) is equal to L * h1 * 2 sides 5, M7, cement mortar autoclaved ash brick form brick base (cubic meters) V = (L + L - embedded in the column length) * * (foundation height + discount level) wall thickness - embedded foundation concrete volume concrete components (ring beam or deducted from the base height) Backfill soil (cubic meters) V = foundation excavated volume in the base tank - the volume of the buried objects under the outside ground. Such as concrete pad, concrete foundation, brick foundation, column etc. Indoor (room heart) backfill soil (

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档