残余填埋场HDPE膜防渗施工计划(国外英文资料)
垃圾填埋场HDPE膜防渗施工方案(国外英文资料)
Landfill site HDPE membrane antiseepage construction plan
First chapter, requirement of base plane
1. Before laying HDPE geomembrane, shall, in conjunction with the civil engineering, building, design, owner of laying base to conduct a comprehensive inspection, comply with the design requirements, construction conditions, and delivery inspection records rear can construction.
2. The base quality should comply with the design requirements: foundation pit bottom slope, slope and slope ratio, the anchorage slot, slope and handling at the junction of righteousness, the warehouse wall concrete base shall be strictly meet the design requirements.
3. The base should be dry, compaction, smooth, no cracks, no obvious tips, no dirt, no sag, vertical depth should be 25 mm internal roots, rubble, stone, steel, glass crumbs. The flatness should be gradual change in the allowable range, the slope uniformity and the slope uniformity.
The Angle of the Yin and the Angle of the base of the plane is a smooth transition, and the root of the column should be a circular arc.
The basal surface is dry and the moisture content should be below 15%.
6. Basal uniform should be solid, dry density of soil basal shall not be less than 1.4 t / ㎡.
After the approval of the inspection and approval of the construction, supervision, design unit, owner, and the general contractor, the construction of the working film shall be carried out.
Chapter ii. The climate requirements for construction
The temperature should be above five degrees centigrade, the geomembrane should be tense at low temperature, and the earthen membrane should be relaxed at high temperature.
The wind is below level four.
When the temperature is too low, the wind and snow weather should not be working.
In wind weather, when the wind is affecting the construction of the earthwork, the HDPE film which is soldering is pressed in the sandbag.
Chapter 3, the laying of HDPE
Prior to the installation of the HDPE, t
您可能关注的文档
最近下载
- 湖南省医学类专业专升本考试生理、解剖学考试试卷.pdf VIP
- 阿里巴巴的“神雕侠侣”——员工的价值观行为准则.docx VIP
- 2023-2024学年山东省滨州市沾化区二年级(上)期末数学试卷(含答案).pdf VIP
- 引号的“世界”━━引号用法考点解析.pdf VIP
- 2024年骨科外固定支架行业研究报告及未来五至十年预测分析报告.docx
- 2023-2024学年山东省济南市长清区人教版二年级上册期末测试数学试卷「含答案」.pdf VIP
- 研究是一门艺术(The_Craft_of_Research).pdf VIP
- 某市中级人民法院院长民主生活会个人对照检查发言提纲.docx VIP
- 2022-2023学年山东省济南市槐荫区二年级(上)期末数学试卷.Doc VIP
- 2023-2024学年山东省东营市二年级(上)期末数学试卷.doc VIP
文档评论(0)