《修建施工技巧(Ⅰ)1411》第2次功课(国外英文资料).doc

《修建施工技巧(Ⅰ)1411》第2次功课(国外英文资料).doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
《修建施工技巧(Ⅰ)1411》第2次功课(国外英文资料)

《建筑施工技术(Ⅰ)1411》第2次作业(国外英文资料) The construction technology (Ⅰ) 1411 a second job Test scores: 122 test time: - test scores: 2 Single topic selection Multiple choice (32 tests, 62 points.) Score: 2 The first premise of a rhythm of water, such as an organization A. The amount of engineering in each construction section is approximately equal B.determine the tempo of the flow of water that dominates the construction process C. make the flow rate of the construction process equal D. regulate the number of workers A full score: 2 The components are pre-installed, and the purpose is for the components A. install B. para C. correction D. B and C 2 points: 2 The free jet lag of work A. it doesnt affect the operating time of the work as soon as it begins The operating time of the work is not affected by the delay of the operation C. does not affect the operating time of the work period D. does not affect the operating time of the work A full score: 2 In the plan of the network, the earliest time of work should be A. The maximum amount of time before all the hard work is done B. all the minimum values of the first completed work C. all the maximum amount of time that is completed before tightening D. all the maximum amount of time to complete the work A full score: 2 The following are not part of the design of the construction organization A. prepare the construction plan B.determine the progress of the construction C. reasonable arrangement of construction site D. compile the construction budget 2 points: 2 In the case of technical intervals and insertion time, the running water of the rhythmic water is equal to (). A. the construction period B. the construction period C. The number of construction procedures Water beat 2 points: 2 The best way to organize a project is to do it In turn Parallel construction Flow construction 2 points: 2 8. There is a key line in the two codename network diagram, and try to select the correct number A. the 1-2-5-6 B. the 1-3-4-6 1-2-3-4-6 D. T

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档