- 1、本文档共15页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
中间空调水管装置标准(国外英文资料)
中央空调水管安装规范(国外英文资料)
Air conditioning unit installation
Check and preparation before 5.1 installation should be checked out before equipment installation, according to the instruction manual equipment packing list, certificate of approval, inspection records and other necessary assembly drawings and technical documents, check the model, specification and all parts, components, subsidiary materials and special tools, and signed by the user acceptance.
Room 5.2 indoor machine installation
The installation of the 5.2.1 chamber machine is maintained, the air conditioning can be all over the room, and easy to arrange the connecting pipe, wiring, water pipe and indoor external machine. When installing, indoor machine derrick nut must have anti-loose measure to ensure the safety of installation. Under the chamber machine box and the copper pipe joint, there must be an inspection port, and the installation of the indoor machine must be convenient for installation and maintenance.
The indoor machine, such as the ceiling of the installation, can be used to install the indoor machine by installing hanging bolts such as buried bolts or expansion bolts. If the ceiling is a prefabricated plate, the T can be used to hoist the indoor machine. When the ceiling is not strong enough, measures should be taken before installing the indoor machine to ensure the reliability and safety of the installation.
5.3 fan coil unit installation
The appearance should be carefully checked before installing 5.3.1, and the test will be carried out on a single machine, and the test will be made if the sound is normal and running smoothly. After installation, the water pressure test of the unit should be carried out, the test pressure is 1.5 times the pressure of the system. Test observation time is 2min, no leakage is qualified.
The 5.3.2 units shall set up separate branches and hangers, and the position, height and slope of the installation shall be correct and fixed.
The lower ceiling of the 5.3.3 uni
您可能关注的文档
最近下载
- 2024年上海市普通高校招生本科艺术甲批次平行段院校专业组投档分数线美术与设计类.pdf VIP
- 2024入团共青团基础知识题库(含答案).docx
- 2024年在线网课学习课堂《健康管理科研思维训练(杭州师大 )》单元测试考核答案.pdf
- 2024年中国河南国际合作集团有限公司人员招聘考试题库及答案解析.docx
- 《骆驼祥子》读书分享PPT课件(精选图文).pptx
- 汉长安城遗址总体规划.pptx
- 欠钱不还的法院起诉书.docx VIP
- GB-T 10125-2012 人造气氛腐蚀试验 盐雾试验.pdf
- 新人教版七年级上册生物全册教案(2024年秋季新版教材).docx
- pcs-9651_080885技术和使用说明书.pdf
文档评论(0)