主厂房土方回填计划(国外英文资料).doc

  1. 1、本文档共12页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
主厂房土方回填计划(国外英文资料)

主厂房土方回填方案(国外英文资料) Backfill plan of the main plant 1, engineering overview: The natural floor level of the main factory is between -2.7 and -2.2. In order to design the above 0.000 elevation and natural ground level, the soil is required to be reclaimed and the refill project is large. The amount of land in the workshop area is approximately: 150000m3. 2, preparing the basis: Construction manual (4th edition). 2.2 million tons master factory construction drawings. The uniform standards for the acceptance of construction quality of construction projects. Gb50300-2001. Construction foundation, quality acceptance of foundation construction. Gb50202-2002. Construction sequence: Clearing clutter, leveling ground, paving soil, soil ramming, testing and delivery. First, the backfill area is higher than the natural floor area (such as the rail base area of the ladle), and the area is returned to the outside of the pile to be greater than 1 m. And then you fill in the rest. 4, physical engineering: The name of the unit The number of Plain soil The m3 150000 Machine input: The machine is two, the earth car 20, the loading machine 3 ~ 4, the bulldozer 2, the frog type ramming machine 20, the hammer type ramming machine 10. Labor input: Unskilled labourer, 100. Main construction procedure: 7.1 basis processing: 7.1.1 venue to backfill should be clear the rubbish on the basal, grass, tree roots, the water in the foundation pit of sundry, stagnant water and measures should be taken to prevent the surface into the fill area. 7.1.2 when the ground is filled with soil, the foundation shall be fully compacted and compacted. 7.1.3 when fill the mud pit near dewatering well loose land of big water content, such as drainage drainage should be taken according to the specific situation, or will all dug in silt soil, gravel filling, filling sandy gravel and other measures to deal with. 7.2 earth requirement: The fill should meet the design requirement and ensure the strength and stability

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档