乌苏大桥引道延长线(黑瞎子岛骨干道)工程培植项目(国外英文资料).doc

乌苏大桥引道延长线(黑瞎子岛骨干道)工程培植项目(国外英文资料).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
乌苏大桥引道延长线(黑瞎子岛骨干道)工程培植项目(国外英文资料)

乌苏大桥引道延长线(黑瞎子岛主干道)工程建设项目(国外英文资料) The usu bridge leads a long line of construction projects Construction supervision bidding announcement WuSu bridge approach road extension cord (main bolshoy ussuriysky island) engineering construction project has been by heilongjiang province development and reform commission (NDRC) to black hair change approved by the transport [2010] 2010 date file, the heilongjiang province transportation hall to a black cross hair [2010] 2010 date file construction approval. The project construction unit is the headquarters of the construction of the usu bridge project. Project has the tender conditions, we are on the project roadbed engineering, road engineering, bridge engineering, traffic safety facilities and affiliated facilities along the construction supervision of projects such as public bidding and tendering for WuSu bolshoy ussuriysky island bridge project construction headquarters. The supervising units with the appropriate qualifications are invited to participate in the bidding for the project. The project shall be subject to a post-qualification examination. The scope of the project and the scope of the tender The project of the wusu bridge, which leads the long line (black blind island main road), has a length of 6.871 km (half amplitude), and the technical standard is a first-class highway. Construction period of this project: from January 2011 to October 2012, 22 months, 46 months of supervision. The project shall set up a supervisory organization. Set up the office of general supervision engineer (hereinafter referred to as the director). The supervision contract paragraph is divided as follows: The serial number Supervision of the contract period Start-stop pile no. route Length (km) The construction of the The contract period Main job one J1 K6 + 405 - K13 + 276 6.871 A1 The supervision of the bridge, roadbed, pavement, traffic safety facilities and other facilities along the route The tenderers qualification requirements A

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档