- 1、本文档共6页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
光电铁路练习训练室(国外英文资料)
光电铁路演练室(国外英文资料)
Practical training base of road bridge engineering technical specialty
The development of the practical training program of the photoelectric railway drill room
Rehearsal room introduction
The name of the equipment: the integrated sandbox model of the railway and the cross-model of the three-layer metro
Equipment: railway drill sand table model according to the actual size according to the proportion, such as railway and the related objects and the environment, such as railway locomotive, train, rail, signal system, bridge, tunnel, etc., also includes the surrounding scenery, such as roads, buildings, railway stations, the platform, crossings and vehicle, pedestrian, etc., natural scenery such as rivers, hill canyons, have very strong authenticity. Railway by the controller drives the car after deliver current motor, simulation model trains can exercise, including forward, backward, the light conversion of speed and sound effects, not only can ensure the precision of railway engineering static observation, can dynamically demonstrate again, show true car at different running states of the system.
Subway crossing three layer model is divided into the ground layer and underground layer and underground layer, a passage between the floors connected to each other, covers on the ground and underground transportation system, the main display of the subway, the structure principle of transfer station and arrangement, the relationship of the subway to the surface of the road intersection, up and down stairs, up and down the lift ticket gate reasonable decorate, imports and exports, and the exchange relations, etc.
Main purpose: to recognize the main structure of railway construction, the train running in the railway system; To understand the structure principle and arrangement of metro and transfer station, the interrelation between metro and surface highway intersections.
Support of the training program: the important material of the railway project to und
您可能关注的文档
最近下载
- QB_T 4563-2013金砂糖.pdf
- 大坝安全监测系统运检导则(试行) QGDW 46 10022.24-2020.docx VIP
- 第五单元 一方水土养一方人 达标训练(含答案) 浙江省人教版七年级人文地理下册.docx
- 奋进新征程建功新时代PPT模板.ppt VIP
- 规范《GB712-88-船体用结构钢》.pdf
- 二年级上册语文教学设计21《狐假虎威》一等奖 刘芳 部编版.docx VIP
- Q_GDW 46 10022.25-2020 通风空调系统运检导则.docx
- 12如何帮助学生学会正确地与异性同学交往?.docx VIP
- 专题1.2 数轴与动点经典题型(四大题型)(原卷版).docx VIP
- 拉森钢板桩专项施工方案.doc
文档评论(0)