公租房工期耽搁说明(国外英文资料)

公租房工期延误说明(国外英文资料) Delays in construction The project is designed by hefei municipal design institute, which is located in the high street. The construction cost of the project, which started on October 18, 2013, was 5190,000 yuan. Quality grade is qualified engineering. Start date: October 18, 2013, completion date: June 18, 2014, total calendar days: 240 days. The project is scheduled to start on October 18, 2013, but after I construction unit positioning pay-off, drivers approach: central school week President oral notice when excavating the entire public housing interior elevation requirements change, suspend the construction. On October 25, 2013, President zhou with high shop township townships, to the scene reconnaissance, chairman of the National Peoples Congress, President zhou to the chairman, townships and clarify the causes of plus or minus zero down late (considering the overall layout of the construction of the central school). After the study by the local party committee of the high store, the detailed data of positive and negative zero decline were initially confirmed by the second time on October 30, 2013. On November 5, 2013, the design unit of the principal design unit of zhou was asked to issue a design change. Construction units on November 14, 2013, I received the change notice, central school issued by demanding shop township public housing 1 # floor plus or minus zero decrease 1.3 meters, plus or minus zero 2 # floor (1.2 meters, the doorman plus or minus zero down 1.85 meters. My construction unit received the design change list and started the excavation on November 15, 2013. The change in the positive and negative zero was delayed by 28 days. Where is the delay? Design change list. ? Supervisors opinion: anhui minghong construction engineering co., LTD., the project department of high store township public rental housing ? The 2014-8-26 Delays in construction The project is designed by hefei municipal design institute, which is located in t

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档