- 1、本文档共9页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公租房工期耽搁说明(国外英文资料)
公租房工期延误说明(国外英文资料)
Delays in construction
The project is designed by hefei municipal design institute, which is located in the high street.
The construction cost of the project, which started on October 18, 2013, was 5190,000 yuan. Quality grade is qualified engineering. Start date: October 18, 2013, completion date: June 18, 2014, total calendar days: 240 days.
The project is scheduled to start on October 18, 2013, but after I construction unit positioning pay-off, drivers approach: central school week President oral notice when excavating the entire public housing interior elevation requirements change, suspend the construction. On October 25, 2013, President zhou with high shop township townships, to the scene reconnaissance, chairman of the National Peoples Congress, President zhou to the chairman, townships and clarify the causes of plus or minus zero down late (considering the overall layout of the construction of the central school). After the study by the local party committee of the high store, the detailed data of positive and negative zero decline were initially confirmed by the second time on October 30, 2013. On November 5, 2013, the design unit of the principal design unit of zhou was asked to issue a design change. Construction units on November 14, 2013, I received the change notice, central school issued by demanding shop township public housing 1 # floor plus or minus zero decrease 1.3 meters, plus or minus zero 2 # floor (1.2 meters, the doorman plus or minus zero down 1.85 meters. My construction unit received the design change list and started the excavation on November 15, 2013. The change in the positive and negative zero was delayed by 28 days.
Where is the delay? Design change list.
?
Supervisors opinion: anhui minghong construction engineering co., LTD., the project department of high store township public rental housing
? The 2014-8-26
Delays in construction
The project is designed by hefei municipal design institute, which is located in t
您可能关注的文档
- 主厂房屋面檩条计算书(国外英文资料).doc
- 主厂房装置间吊车梁装置计划(国外英文资料).doc
- 主厂房土方回填计划(国外英文资料).doc
- 主要的外力感化及其地貌(国外英文资料).doc
- 主题工程施工组织设计 txt格局(国外英文资料).doc
- 久保田KX155挖掘机(国外英文资料).doc
- 久保田U15-3S挖掘机(国外英文资料).doc
- 乌审旗家当园区介绍(国外英文资料).doc
- 义务三手动变速器的拆装与检测(国外英文资料).doc
- 主城意境(国外英文资料).doc
- B&R PLC系列开发:PLC X20系列_B&RPLC软件开发环境介绍.docx
- 300系列_BISV-300软件平台.docx
- 200系列_BISV-200的维护与故障排除.docx
- B&R PLC系列开发:PLC X20系列_B&RPLC硬件架构与选型.docx
- 300系列_BISV-300开发环境搭建.docx
- 006系列_BTL-006通信协议分析.docx
- B&R PLC系列开发:PLC X20系列_X20系列PLC的故障诊断与调试.docx
- 2024年江苏省苏州市初三中考物理真题试卷含详解 .pdf
- 2024年基金从业资格证之证券投资基金基础知识模拟题库及答案下载.pdf
- 2024年大学生个人学习计划样本(三篇) .pdf
文档评论(0)