全现浇剪力墙结构钢筋装置(国外英文资料).doc

全现浇剪力墙结构钢筋装置(国外英文资料).doc

  1. 1、本文档共8页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全现浇剪力墙结构钢筋装置(国外英文资料)

全现浇剪力墙结构钢筋安装(国外英文资料) The construction of the steel bar is installed First, the working conditions According to the specification of the design drawing, choose the appropriate feed length to avoid waste, and the rebar processing or welding net. The rust on the surface of the steel bar is cleaned before the binding. The dimensions, specifications and quality of the meshing of the meshing are available. Play the wall and the line of the hole, and remove the loose concrete from the seams. The electroslag pressure welder should be trained by the internal training and shall be tested and qualified before the class. Prefabricate the cement mortar block or purchase plastic card as protective layer. Familiar with drawing and technical background. Two, material requirement The steel bar has the factory quality certificate and is qualified by the examination. Third, construction equipment The bar hooks, crowbars, nets, bands, steel wire brushes, steel bars, stone pens, ink fights, rulers, etc. Second, process flow The line and the pretest, the forming bar approach, the bar, the welding joint, the binding and the post of the wall, and the acceptance of the transfer Third, operation craft The repair is reserved for stretching According to the wall line, adjust the extension of the lower wall to make the position correct. If the wall of the lower floor is outstretched, the design staff should be consulted. Generally press 1:6 adjust, with steel mesh piece to catch up. Second, the welding, the lashing of the joints For the dark columns, doors and Windows at the hole edge artifacts such as the vertical force appropriate reinforcement mechanical connection or welding, to three or four seismic grade, when D 22 mm or less, can use the welded lap joints. It is easy to think about economy and operation, and use electroslag pressure welding. The anchorage length of reinforcing bars around the hole should meet the requirements of construction detail of earthquake seismic construction (03

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档