发电机维修颐养资料(国外英文资料).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
发电机维修颐养资料(国外英文资料)

发电机维修保养资料(国外英文资料) Applicable to the standby generator set maintenance scheme (such as residential area, building, hospital, office unit, scenic spots, such as factory power outages, rarely used only for fire control, power cut overhaul time, only with the standby generator set) Routine maintenance: on the basis of daily maintenance, once every six months or once a year Conduct a thorough examination of water, electricity, oil and gas in the generator set, and make sure that the unit is normal; 5-10 minutes of empty test drive to allow the crew to be fully lubricated; Judge the use of the unit by listening, watching and smelling; Change air filtration, diesel filter, oil, oil, water filtration, oil and water separator, etc. 4, replace cooling water tank coolant, water tank treasure; Add battery battery or distilled water. After the maintenance is completed, the unit is inspected again and cleaned and cleaned. 5-10 minutes of empty test machine, record the performance parameters of the unit, provide reasonable suggestion and customer acceptance. Suitable for long-term operation of generator set maintenance scheme (such as construction sites, often power plant, transformer load enough, project test, can not pull the mains, etc., often need to run continuously or generator) Primary technical maintenance: (50-80 hours) increases in the content of daily maintenance Clean air cleaner and replace when necessary; 2, replace diesel filter, air filter, water filter; Check the tension in the driving belt; Lubricate all the oil filling and lubricating parts. Replace cooling water Secondary technical maintenance: (250-300 hours) increases in the content of daily maintenance and primary maintenance Clean piston, piston pin, cylinder liner, piston ring, rod bearing and check for wear and tear. Check the inside and outside circles of the main bearing are not loose; Remove the scale and silt in the water system of the cooling water system; Remove the coals from the combustion chambe

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档