- 1、本文档共7页,可阅读全部内容。
- 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地基基础、主体分部及完工验收流程(国外英文资料)
地基基础、主体分部及竣工验收流程(国外英文资料)
The acceptance process of the foundation
First of all should be reported to the basis of the construction unit self-check qualified supervision, the construction unit and the supervision unit, organized by construction unit of the prospecting units, design units, supervision units, construction units and quality supervision departments to check acceptance together. The foundation meets the requirements of design, specification and so on.
Conference host: chief engineer
Check the content:
Check the location, size and depth of the grooves to match the design drawings.
Check the type and evenness of the groove and bottom soil and see if there is an abnormal soil quality. Check the soil quality and the underground water condition in accordance with the survey report.
Check whether there are old buildings, ancient Wells, tombs, caves, underground burying objects, underground human defense works, etc.
Check the distance between the outside edge of the base groove and the nearby buildings, and the excavation of the foundation pit will influence the stability of the building.
Check and verify the data, check the existence anomaly.
Foundation and foundation, subject branch acceptance procedure
Division of the project by the director of engineer, head of the organization construction unit and the technical, quality, survey, design units, construction units, head of the project manager and the quality and safety supervision department heads in the acceptance.
The acceptance of foundation and foundation units:
Survey units, design units, supervising units, construction units, construction units and quality supervision departments;
The unit of acceptance of the subject branch:
Designing units, supervising units, construction units, construction units and quality supervision departments;
The acceptance process:
Preparation work: the construction unit is ready for the gb50300-2001 unified standards for the acceptance of the quality of construction project
文档评论(0)