大工11秋《水电站修建物》在线功课2(国外英文资料).doc

大工11秋《水电站修建物》在线功课2(国外英文资料).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大工11秋《水电站修建物》在线功课2(国外英文资料)

大工11秋《水电站建筑物》在线作业2(国外英文资料) Big work 11 autumn hydropower station building online homework 2 Test scores: 100 test time: - test scores: 100 The problem of choice is choice (10 questions, 40 points.) Score: 40V 1. In the valve of the pressure line, the ball valve is open without water head loss and water tight. A. mistakes B. right 4 points: 4 Vertical water intake is difficult when the reference flow is too high. A. mistakes B. right 4 points: 4 3. The collection of water power station is refers to the water network, using channels or tunnel of the adjacent small tributaries of the water into the gap with centralized location for power generation of hydropower station. A. mistakes B. right 4 points: 4 The thickness of the hardened rock formations around the pressure water tunnel should be less than 2 times the diameter of excavation, so as to reduce the internal water pressure. A. mistakes B. right A full score: 4 The dam can form a larger reservoir and use more water, so the water can be used less well. A. mistakes B. right A full score: 4 The pressure pipe embedded in the concrete dam is called the inside of the dam, which is often used to prevent rust. A. mistakes B. right A full score: 4 The layout of the pressure water tunnel should be given a certain longitudinal slope to meet the needs of slag and drainage. A. mistakes B. right 4 points: 4 In the force of steel pipe and pier, the friction of the piers and steel pipes is the normal force. A. mistakes B. right A full score: 4 Steel reinforced concrete back tube is a composite structure of lining concrete and outsourced steel. The pipe is located outside the dam body and does not allow the pipe wall to crack. A. mistakes B. right A full score: 4 Reducing water pressure in groundwater is the fundamental way to prevent the stability of steel lining. A. mistakes B. right 4 points: 4 Big work 11 autumn hydropower station building online homework 2 Test scores: 100 test time: - test scores: 100 The problem of choice

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档