大工13秋《土木工程概论》谜底3(国外英文资料)
大工13秋《土木工程概论》答案3(国外英文资料)
The introduction to civil engineering in the 13th autumn introduction to civil engineering online test 3
Exam time: 100 test time:
Single topic selection
Multiple choice
True or false
(10 questions in total, 40 points.)
In the following soil materials, it is absolutely not possible to fill the soil in the form of soil filling (B).
lithosol
B. the permafrost
C. sandy soil
D. clayey soils
Full marks: 4
The properties of soft soil are not included (D).
A. natural porosity is large
High compressibility
C. natural water content is high
D. the shear strength is higher
Full marks: 4
The following statement on the wet loess is wrong (B).
It has A large hole structure
The sand is mainly sandy
C. natural moisture content is close to the plastic limit
D. contains a large amount of soluble salt
Full marks: 4
In the construction of prestressed concrete structures, it is strictly forbidden to use cement containing (A) to prevent it from corroding the steel bar.
A. chloride
B. sulfide
C. alkali
D. the fly ash
Full marks: 4
(B) in the case of the construction of running water, each professional team shall complete the work duration required for the corresponding construction tasks in each construction section.
A.
Water beat
Flow strength
D. technology break time
Full marks: 4
Steel reinforced concrete precast pile should be hoisted after the concrete reaches the design strength grade (B) %.
A. 60
70 B.
80 C.
90 D.
Full marks: 4
The minutes of the project meeting (B).
A. there is no evidence for the claim
B
C. can only serve as a reference for the claim
D. not as a reference for the claim
Full marks: 4
The following is a statement about the double codename network graph, and the error is (B).
A. arrow is for work
Usually the work name is written on the top (or left) of the arrow.
C. write the duration of the work under the arrow (or on the right)
D. In the network diagram, a connection with a double arrow is allowed
Full marks: 4
The steel pipe which will c
您可能关注的文档
- 土木概论温习参考资料1(国外英文资料).doc
- 土木论文(国外英文资料).doc
- 土概考点(国外英文资料).doc
- 土石坝设计案例(国外英文资料).doc
- 土石方回填与碾压工程质量操纵要点(国外英文资料).doc
- 土木工程施工 课后功课(国外英文资料).doc
- 土钉墙施工流程(国外英文资料).doc
- 在C#中应用异步Socket编程完成TCP收集干事的CS的通信构架(二)应用方法(国外英文资料).doc
- 在Excel2010中绘制简单的甘特图(国外英文资料).doc
- 在后的将要在前(国外英文资料).doc
- 宣传部长在2024年自治区志愿服务事业发展推进会上的讲话.docx
- 市委书记在2024年全市红色文化资源开发利用推进会上的讲话.docx
- 在2024年全市红色文化资源开发利用推进会上的讲话.docx
- 在全县党员干部廉政专题党课上的讲稿:全力巩固发展风清气正的良好政治生态.docx
- 在集团公司2024年第三季度安全生产总结暨第四季度工作部署会上的讲话.docx
- 某市卫健委关于市委市政府安全生产专项督察问题整改情况的报告.docx
- 某市12345投诉办理工作经验交流材料.docx
- 某中学2024—2025学年度安全工作计划.docx
- 院长在马克思主义学院(法学院)2024级开学典礼上的讲话.docx
- 市文旅局2024年国庆假期旅游工作总结.docx
文档评论(0)