大工13秋《土木工程概论》谜底3(国外英文资料).doc

大工13秋《土木工程概论》谜底3(国外英文资料).doc

  1. 1、本文档共13页,可阅读全部内容。
  2. 2、有哪些信誉好的足球投注网站(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
大工13秋《土木工程概论》谜底3(国外英文资料)

大工13秋《土木工程概论》答案3(国外英文资料) The introduction to civil engineering in the 13th autumn introduction to civil engineering online test 3 Exam time: 100 test time: Single topic selection Multiple choice True or false (10 questions in total, 40 points.) In the following soil materials, it is absolutely not possible to fill the soil in the form of soil filling (B). lithosol B. the permafrost C. sandy soil D. clayey soils Full marks: 4 The properties of soft soil are not included (D). A. natural porosity is large High compressibility C. natural water content is high D. the shear strength is higher Full marks: 4 The following statement on the wet loess is wrong (B). It has A large hole structure The sand is mainly sandy C. natural moisture content is close to the plastic limit D. contains a large amount of soluble salt Full marks: 4 In the construction of prestressed concrete structures, it is strictly forbidden to use cement containing (A) to prevent it from corroding the steel bar. A. chloride B. sulfide C. alkali D. the fly ash Full marks: 4 (B) in the case of the construction of running water, each professional team shall complete the work duration required for the corresponding construction tasks in each construction section. A. Water beat Flow strength D. technology break time Full marks: 4 Steel reinforced concrete precast pile should be hoisted after the concrete reaches the design strength grade (B) %. A. 60 70 B. 80 C. 90 D. Full marks: 4 The minutes of the project meeting (B). A. there is no evidence for the claim B C. can only serve as a reference for the claim D. not as a reference for the claim Full marks: 4 The following is a statement about the double codename network graph, and the error is (B). A. arrow is for work Usually the work name is written on the top (or left) of the arrow. C. write the duration of the work under the arrow (or on the right) D. In the network diagram, a connection with a double arrow is allowed Full marks: 4 The steel pipe which will c

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档