屋面板装置细则1(国外英文资料)
屋面板安装细则1(国外英文资料)
Eaves, mountain walls, deformation joints, joints, etc. Should be encrypted. The screw should be mounted perpendicular to the panel and must not be emptied. The screw must be removed and treated with glue for incorrect location. The waterproof cap of the screw must be glued to the surface of the screw
The roof panel is fitted with the roof panel, the making model and the vertical transport equipment
2) the end of the roof of the roof of the roof is matched with the purline of the strip.
3) all of the planks position and arrangement in the building need to be 300mm modulus.
4) the fixed mode of roof pressure plate
A: when the pressure plate is connected to the purline, the galvanized self-tapping screw with waterproof washer is fixed and fixed
It should be located at the crest of the wave, the distance is equal to 350mm, and the connection to the same purline or wall shall not be less than 3 points. When fixed, the manual operation is moderate, it is not appropriate to hold the self-tapping screw tightly or too loose to prevent the formation of cracks.
B: when the pressure plate is connected to the pressure plate, the pull rivets with the waterproof washer are fixed and the spacing of the rivets is 250mm.
C: all the leakage of self-drilling screws and rivets shall be daub sealing material protection, such as sealing glue), and waterproof cap, exposed screw seal material protection.
D: when laying the roof of the steel plate, the connecting two sides of the plate should be connected by the maximum frequency to avoid
The cold air is poured indoors when the wind is blowing.
Pressure type metal roof panel shall be length on the supporting component
project
Lap length (mm)
Adjacent two compression metal plate (height greater than 70)
375
Adjacent two pressing metal plates meet the inner slope of the roof 1/10
250
The slope in the roof is greater than 1/10
200
The roof plate is connected to the panpan
200
The pan-water board on the roof of the steel plat
您可能关注的文档
- 大工13春《土木工程概论》在线测试3(国外英文资料).doc
- 大工13春《钢结构》功课谜底3(国外英文资料).doc
- 大工13秋《修建资料》指点资料十一(国外英文资料).doc
- 大工13秋《修建施工》在线功课2及谜底(国外英文资料).doc
- 大工13秋《土木工程概论》谜底3(国外英文资料).doc
- 大工13秋《工程项目治理》在线功课2谜底(国外英文资料).doc
- 大工13秋《工程力学(一)》在线功课3(国外英文资料).doc
- 大工13秋《工程抗震》在线功课1,2,3(国外英文资料).doc
- 大工13秋《高层修建结构》在线功课1,2,3(国外英文资料).doc
- 大工14春《房地产开辟与运营》在线功课3谜底(国外英文资料).doc
最近下载
- 放紧线工作及安全注意事项.pptx
- 统编版道德与法治六年级上册期末试卷(含答案).docx VIP
- 部编版语文四年级上册第2单元习作《我的家人》课件.pptx VIP
- 2024年重庆市安全员-B证考试题库附答案.doc VIP
- 《汽车发动机再制造过程质量控制研究》16000字.doc
- 航空学院航空法规.ppt
- 隧道注浆堵水施工方案.pdf
- 统编版六年级上册道德与法治期末测试卷(含答案).doc VIP
- 必考点10等边三角形的性质与判定-【题型·技巧培优系列】2022-2023学年八年级数学上册精选专题(人教版)(原卷版+解析).docx VIP
- 2024新信息科技三年级第一单元:开启信息生活大单元整体教学设计.docx
文档评论(0)